North Jersey District Water Supply Commission Report 1930

  • $100.00



RailroadTreasures offers the following item:
 
North Jersey District Water Supply Commission Report 1930
 
North Jersey District Water Supply Commission Report 1930


TABLE OF CONTENTS
CHAPTER I-SUMMARY OF REPORT
Page
Activities of the Year 1
Wanaque Project  1
Second Major Project 2
Death of Commissioner McKee 3
Water Analysis Laboratory 4
Organization  4
CHAPTER II-WANAQUE PROJECT
Operation  6
Opening of Aqueduct 6
Program of Dedication 7
Address of Governor Larson 11
Address of Mayor Congleton 11
Address of Chairman Sommer 12
Delivery of Water 13
Operation and Maintenance 16
Chlorination  16
Wanaque Reservoir Storage 17
Bayonne Contract  18
Lake Developments Within the Watershed 20
Water Analysis Laboratory 23
Design  24
General Features  24
Wanaque Aqueduct  25
Headworks  25
Lower Gate House 25
Aerator  26
Pumping Station  27
Surge Tank  27
Service Building  28
Landscaping  28
Balancing Reservoir  29
Record Drawings  30
Water Rights  30
Construction  31
Steel Pipe Line, Contract 25 31
General  31
Construction, Contract 25 32
Construction (Continued)
Steel Pipe Line, Contract 25 (Continued)Page
Grouting  36
Testing Tunnel  37
Placing Pipe in Tunnel 39
Work Outside Tunnel 40
Newark and Kearny Connections at Belleville 40
Completion  43
Reinforcement of Wanaque Tunnel-Contract 29 45
Construction of Headworks-Contracts 33A-B-C 47
Contract 33A  48
Pipe  51
Contract 33B  53
Contract 33C  54
Flood-lighting  54
Pumping Equipment-Contract 32 55
Electrical Equipment-Contract 34 56
Balancing Reservoir-Contract 35 58
Real Estate  59
Land for Wanaque Reservoir 59
Aqueduct  60
CHAPTER III-FINANCIAL
Receipts and Expenditures 61
CHAPTER IV-ADDITIONAL SUPPLY
Applications for New Water Supplies 66
Borough of Allendale 66
Borough of Haledon 66
Additional Supply  66
Chimney Rock Report of 1930 70
Summary  70
Outline of 1925 Chimney Rock Project 73
Chimney Rock 1930 Project-First Stage 74
Future Extensions  86
Comparison with Projects of the State Water Policy Com-
mission    91
Water Consumption  98
Available Water  103
Yields of additional supply watersheds

Appendices
LIST OF TABLES
Table No.Page
1 Table of Wanaque Water Delivery 13
2 Deficiencies in Rainfall in New Jersey 17
3 Wanaque Reservoir Elevation 18
4 Quantities of Work Completed on Contract 25 44
5 Summary of Bids-Contracts 33A-B-C 48
6 Summary of Bids-Contract 33-Pumping Equipment 54
7 Summary of Bids-Contract 34-Electrical Equipment 56
8 Summary of Bids-Contract 35-Balancing Reservoir 57
9 Quantities of Work Completed on Contract 35 59
10 Statement of Receipts 62
11 Statement of Disbursements 64
12 First Stage of Chimney Rock Development-1930 Estimate of Cost 83
13 Modifications Feasible in First Stage of Chimney Rock Project 85
14 Second Stage of Chimney Rock Development as a Two-Stage In-
termediate-Level Supply  90
15 Comparative Data-Water Policy Commission Projects 92
16 Cost of the Chimney Rock, Vernoy, Buddvale and Ralston Projects 93
17 First Two Stages of Chimney Rock Project and Cost of Vernoy and Buddvale Plus Intermediate-Level Projects 94
18 Cost of Chimney Rock Dual Project and Vernoy and Buddvale Dual Projects  95
19 Water Consumption of the North Metropolitan District of New
Jersey  1.00
20 Estimated Future Consumption 102
21 Estimated Future Consumption of Portion of the District Which Can be Supplied from a Major Project Subdivided as to Service Zones   103
22 Safe Yield of Existing Supplies and Possible Extensions 104
23 Supplies Available for Interchange as a District Supply Divided as
to Service Zones  105
24 High-Service Water  106

All pictures are of the actual item.  There may be reflection from the lights in some photos.   We try to take photos of any damage.    If this is a railroad item, this material is obsolete and no longer in use by the railroad.  Please email with questions. Publishers of Train Shed Cyclopedias and Stephans Railroad Directories. Large inventory of railroad books and magazines. Thank you for buying from us.

Shipping charges
US Shipments:  When you add multiple items to your cart, the reduced shipping charges will automatically be calculated. .    For direct postage rates to other countries, send me an email.   Shipping varies by weight.

Payment options
Payment must be received within 7 days. Paypal is accepted.

Terms and conditions
All sales are final. Returns accepted if item is not as described.  Contact us before making a return.  No warranty is stated or implied. Please e-mail us with any questions before bidding or buying.   

Thanks for looking at our items.