|
Modern Railroads 1965 August Utilization key to improved car supply Hopper inte
Modern Railroads 1965 August Flood NWP Car shortages Budd Super Speed train 132 pages Lots of ads Pages are loose, Page 17 had pen marks around bot sides of a paragraph, last page 132, may be missing ads.
Editorial Comment: Blueprinting Government R&D in Transportation Whatever Happened to those "Brief" Reports? 53
Publisher's Notebook: Part of the Railroad Team132
Inside Track: WP's New President Aims for More Revenue Growth 47
Report from Washington: Will Northeast Corridor Proposals Languish in Hot Summer? 32
Observation Car: Enthusiasm and Shea Stadium 17
New System Washes Hopper Interiors for Santa Fe 103
Two-track system washes 200 cars in eight hours
Trains Roll Again on Flood-Ravaged NWP 57
Small road rallied to restore service after flood caused $10 million damage
AAR Readies Machine Language Interchange by Nancy Ford 58
AAR's one-year-old Data Systems Division has two major projects near completion
Car Shortages: The Role of Utilization by Albert E. Brinkley 64
Maximum utilization is a must if railroads are to increase their share of the freight market
Budd Unveils New Super-Speed Train by Albert E. Brinkley 69
Revolutionary train with aircraft turbine engine or electric power can travel up to 160 mph
CN Cuts Ribbon at Toronto Yard 72
New $75 million yard is called world's most advanced automatic freight classification yard
Munich Exhibit Surveys Transportation Growth by P. E. Punt . . . 81 International Exhibition of Transport and Communications spotlights world-wide developments
PRR Boosts Production at New Electric Shop 84
New shop for repair and overhaul of diesel traction motors and generators at Altoona features high degree of coordination and automation
Functional Organization for Engineering by James A. Caywood . . . 88
Proposal for a modern engineering department with three functions: de-
sign, control and operations
Alco Delivers New 3000-hp Locomotive to ACL 96
Introduces six-motor Century 630 and four-motor Century 430 with AC alternators
Offer New Container System107
Flatcar carries demountable piggyback trailer's wheels under the car Joint Straightener Extends Rail Life 111
Process of vertical cold bending is used by new machine
Awards Presented to the Modern Kate Shelleys 114
One grand award trophy and eight achievement plaques given at NARBW dinner
All pictures are of the actual item. There may be reflection from the lights in some photos. We try to take photos of any damage. If this is a railroad item, this material is obsolete and no longer in use by the railroad. Please email with questions. Publishers of Train Shed Cyclopedias and Stephans Railroad Directories. Large inventory of railroad books and magazines. Thank you for buying from us.
Shipping charges
US Shipments: Ebay will add $1.25 each additional items, there are a few exceptions.
Ebay Global shipping charges are shown. These items are shipped to Kentucky and forwarded to you. Ebay collects the shipping and customs / import fees. Refunds may be issued if you add multiple items to your cart and pay with one payment. For direct postage rates to these countries, send me an email. Shipping varies by weight.
Payment options
Payment must be received within 7 days. Paypal is accepted.
Terms and conditions
All sales are final. Returns accepted if item is not as described. Contact us first. No warranty is stated or implied. Please e-mail us with any questions before bidding.
Thanks for looking at our items.
|